Boise Paper Mill Final Energy Audit Report

Summary

Investment: $31,000
Payback Period: 1 month
Annual Cost Savings: $1 million
Energy Savings: 154,000 MmBtu per year

Dow Chemical Company Petrochemical Plant Final Energy Audit Report

Summary

Investment: $225,000
Payback Period: 1.5 months
Annual Cost Savings: $1.9 million
Energy Savings: 272,000 MmBtu per year

OS Longman State Department Agriculture Food Supply Final Energy Audit Report

Summary

Investment: $12,472
Payback Period: 6 months
Annual Cost Savings: $24,102
Energy Savings: 6,026 GJ per year

Wascana Powerhouse Final Energy Audit Report

Summary

Investment: $29,959*
Payback Period: 1.93 years
Annual Cost Savings: $15,518
Energy Savings: 7,218 GJ per year
*Additional costs to remove asbestos not part of this quote.

AV Nackawic Inc Pulp And Wood Manufacturing Facility Final Audit Report

Summary

Investment: $265,676
Payback Period: 2.6 years
Annual Cost Savings: $102,043
Energy Savings: 14,390,131.2 Btu per day

Goodyear Tire Production Plant Final Energy Audit Report

Summary

Investment: $180,000
Payback Period: 2.5 months
Annual Cost Savings: $875,000
Energy Savings: 93,000 MMBtu per day and 224,000 gallons per year of No. 6 fuel oil

Leduc Food Processing Development Center Final Energy Audit Report

Summary

Investment: $176,000
Payback Period: 7 months
Annual Cost Savings: $10,100
Energy Savings: 2,527 GJ

West Linn Paper Manufacturing Mill Final Energy Audit Report

Summary

Investment: $7,529
Payback Period: 6 months
Annual Cost Savings: $379,000
Energy Savings: 58,200 MMBtu per day

Cairnsmore Place Healthcare Facility Final Energy Audit Report

Summary

Investment: $ 3,150
Payback Period: 1.67 years
Annual Cost Savings: $1,888
Energy Savings: 128 GJ per year

Eagle Park Hospital Final Energy Audit Report

Summary

Investment: $3,492
Payback Period: 3 years
Annual Cost Savings: $1,150
Energy Savings: 78 GJ per year

Nanaimo Regional Hospital Final Energy Audit Report

Summary

Investment: $3,492
Payback Period: 3 years
Annual Cost Savings: $10,059
Energy Savings: 682 GJ per year

NIA Study on Mechanical Insulation in Hospitals

Summary

This white paper study focuses on quantifying the use of Mechanical Insulation in schools and hospitals. On average, hospitals in the study with ASHRAE-rated Mechanical Insulation realized a 2.1 percent energy savings. The entire study can be downloaded and reviewed for best practices in hospitals.

Saanich Peninsula Hospital Final Energy Audit Report

Summary

Investment: $2,336
Payback Period: 4 years
Annual Cost Savings: $2,300
Energy Savings: 236 GJ per year

Tofino General Hospital Final Energy Audit Report

Summary

Investment: $ 2,428
Payback Period: 2.7 years
Annual Cost Savings: $873.50
Energy Savings: 32.4 GJ per year

Trillium Lodge Residential Healthcare Final Energy Audit Report

Summary

Investment: $8,128
Payback Period: 5.8 years
Annual Cost Savings: $1,395
Energy Savings: 34,889 Kwh per year

Victoria General Hospital Final Audit Report

Summary

Investment: $31,860
Payback Period: 3.4 years
Annual Cost Savings: $9,240
Energy Savings: 1,043 GJ per year

Victoria General Hospital Laundry Services Final Energy Audit Report

Summary

Investment: $12,662
Payback Period: 6.4 years
Annual Cost Savings: $1,978
Energy Savings: 223 GJ per year

West Coast General Hospital Final Energy Audit Report

Summary

Investment: $17,537
Payback Period: 2.39 years
Annual Cost Savings: $7,308
Energy Savings: 540.6 GJ per year

Alberta Infrastructure Building Final Energy Audit Report

Summary

This energy audit revealed recently completed work in the boiler room did not involve placing mechanical insulation on all applicable surfaces leading to system corrosion. Additionally, the audit discovered black mold growing in victaulic elbows and clamps in the chiller and mechanical rooms. Find out what was recommended for the government building in the downloadable energy audit.

Brownlee Government Office Building Final Energy Audit Report

Summary

The results of this energy audit showed damaged and missing mechanical insulation was causing the loss of 934 GJ of energy per year. Addressing the issues within the report will create an annual savings of $3,700. Details on this government building energy audit can be found by downloading the report.

Montana State Facility Buildings Energy Audit

Summary

This energy appraisal focused on mechanical rooms in 25 pre-selected facilities. Overall, approximately 3,500 items to correct or add were identified. The estimated total energy savings were approximately 6 billion BTUs per year with an estimated payback of 4.1 years and an annualized rate of return of 24 percent. Learn more about the details of this energy audit for a government building complex.

Red Deer Provincial Building Final Energy Audit Report

Summary

In one year, this building can recoup the cost to upgrade a portion of the building’s mechanical insulation system. By preventing the loss of 1,221 GJ of energy, an annualized savings of $4,885 will be realized. These upgrades will also prevent the yearly release of 60.6 Mt of CO2 emissions. Additional details about the government building’s energy audit can be found in the downloadable report.

Reynolds Museum Final Energy Audit Report

Summary

While the quality of work to install the mechanical insulation inside the museum’s boiler room was good, some bad practices were followed. Addressing the issues within this audit will prevent the loss of 1,325 GJ of heat, while saving $5,300 per year. Upgrading Mechanical Insulation systems can be beneficial for all museums as they protect priceless materials. More details about the report are available in the energy audit.

Royal Tyrell Museum Final Energy Audit Report

Summary

This energy audit found the museum could save 759 GJ of energy per year, which would result in an annual savings of just over $3,000. The return on investment to implement all the suggested items is less than 2.5 years. More details about this museum’s savings can be found in the energy audit report.

Bernice McNaugton High School Energy Audit And Final Report

Summary

Heat Loss: 2,143,494 Kbtu per year
Investment: $24,711
Payback Period: 1.5 months
ROI: 108.8%
20-year Net Present Value: $513,009
Co2 Emission Savings: 123.3 Mt per year